CRS GEOTUBE® PROJECTS
Geotube®
The drying beds as shown on the left in photo #1 are replaced by Geotube® dewatering containers as seen in the drying bed in right of the picture. An underlay is used in the existing drying bed to aid in the dewatering process. Existing pipework was used, and few changes were required to change from conventional drying methods to the more efficient Geotube® dewatering containers.