BEACONSFIELD QUEST STP

Client: Beaconsfield Quest

Completed:  September 2000

Capacity: 150 EP (36 kL/day)

Services: Design, Manufacture, Installation, Commissioning, Operator Training

This Sewage Treatment Plant (STP) was designed to treat effluent from a caravan park to a quality suitable for irrigation.

This project utilises the Extended Aeration Activated Sludge method of biological sewage treatment incorporating primary sedimentation tank, aeration tank and secondary clarifier. The system uses a CRS Model 150 mild steel packaged STP with aeration supplied via a “Roots” type blower and diffusers.

Disinfection will be undertaken with Ultra Violet sterilisers prior to discharge to an irrigation storage pond.

×