LEIGHTON CONTRACTORS PACKAGE WATER PLANT

Client: Leighton Contractors

Completed:  1999

Capacity: 60 kL/day

Services: Design, Manufacture, Installation, Commissioning, Operator Training

Automated package water treatment plant for the treatment of bore and surface water to potable standards.

This plant was designed and manufactured to treat bore water and/or dam water to drinking quality. The system incorporates flocculation/clarification, media and carbon filtration followed by reverse osmosis filtration for salt removal. Blue/green algae removal is undertaken by a manually activated Powdered Activated Carbon dosing system at the head of the plant. A turbidity meter sampling the influent water mixture (85% ground : 15% surface) activates the chemical dosing pumps prior to the 60° inclined clarifier. A level switch in the treated water tank activates the reverse osmosis filtration system which takes its feed from the clarified water storage tank.

×