Projects

PARSONS BRINCKERHOFF KARRATHA ULTRAPURE WTP

Client: Parsons Brinckerhoff

Completed:  2012

Capacity: 35 kL/day

Services: Design, Manufacture, Testing, Commissioning, Training

This WTP treats dam and bore water to ultra-purity (specified conductivity <1µS/cm) for downstream use in generator turbine combustion NOx suppression.

The equipment is installed in a single, air-conditioned container facilitating dosing stations, control panel, 2-pass RO system including auto-flush on shut down and semi-automated CIP as well as mixed bed demineralisation.

Automation is facilitated by magnetic and vortex flow meters, pH, conductivity and ORP probes, pressure transmitters, an array of pressure and level switches as well as the ability for 3G remote monitoring facilitated by an inbuilt modem.

×
MENU